1st stage of installation of the photovoltaic power plant
- 16. May 2023
- News
We used an available solution and invested in photovoltaics that produce no pollution. As part of the 1st stage, we have successfully installed solar panels on our factory buildings, which can absorb a large amount of solar energy. We plan to continue this trend.
News
- The company ELKOND HHK, a.s. contributed to a good thing! 27. October 2023
- We participated in a seminar on photovoltaic wiring in current practice 27. October 2023
- We were at the ELFETEX fest 2023 27. October 2023